Project Overview

Peak Mechanical were appointed to undertake a major mechanical refurbishment at Corby International Swimming Pool, working closely with the client team to replace the existing gas-fired infrastructure with a high-efficiency air source heat pump system. The project addressed the complex heating and hot water demands of a busy leisure facility while improving environmental performance.

Scope of works included:

  • Working collaboratively with a valued client to deliver all mechanical elements of the project
  • Isolation, decommissioning and removal of existing gas services and plant
  • Installation of air source heat pumps (ASHPs) to serve pool water, space heating and building services
  • Installation of buffer vessels to support system capacity and efficiency
  • Installation of 250mm below-ground distribution pipework to accommodate high flow requirements
  • Installation of new hot water cylinders to serve pool and domestic hot water systems
  • Installation of services to fan coil units to enhance internal temperature control
  • Managing works within a live leisure environment, maintaining safety and operational continuity
  • Delivery of a high-performance, low-carbon heating solution with reduced energy consumption