Corby Cube
February 16, 2026Corby International Swimming Pool
- Corby
- Commercial

Project Overview
Peak Mechanical were appointed to undertake a major mechanical refurbishment at Corby International Swimming Pool, working closely with the client team to replace the existing gas-fired infrastructure with a high-efficiency air source heat pump system. The project addressed the complex heating and hot water demands of a busy leisure facility while improving environmental performance.
Scope of works included:
- Working collaboratively with a valued client to deliver all mechanical elements of the project
- Isolation, decommissioning and removal of existing gas services and plant
- Installation of air source heat pumps (ASHPs) to serve pool water, space heating and building services
- Installation of buffer vessels to support system capacity and efficiency
- Installation of 250mm below-ground distribution pipework to accommodate high flow requirements
- Installation of new hot water cylinders to serve pool and domestic hot water systems
- Installation of services to fan coil units to enhance internal temperature control
- Managing works within a live leisure environment, maintaining safety and operational continuity
- Delivery of a high-performance, low-carbon heating solution with reduced energy consumption
View our other projects
- Client
- Corby International Swimming Pool
- Date
- February 16, 2026
- Client
- Arla, Lockerbie
- Date
- February 16, 2026
- Client
- Arla, Lockerbie
- Date
- February 16, 2026